HEAT PUMPS & SOLAR SIZING

Adding a Heat Pump? How to Plan Solar in Lee’s Summit

Learn how to compare current and future electricity use, winter demand, and rooftop production when planning a heat pump and solar in Lee’s Summit.

If your Lee’s Summit furnace is nearing replacement and you’re also getting solar quotes, your last electric bill tells only part of the story. A switch from gas heat to an electric heat pump can move some or all of your space heating onto that bill. Replacing electric resistance heat with a heat pump is a different starting point. Before either contractor sets a size, make sure both are working from the same heating plan.

Start with what you’re replacing

Gather a year of electric bills and, if you heat with gas, a year of gas bills. Mark which equipment uses each fuel. If your gas bill also includes water heating or cooking, flag that so the HVAC contractor doesn’t attribute all of it to the furnace. Note planned changes to insulation, air sealing or the rooms you heat. A heat pump proposal based on a drafty house can be a poor match if you’re sealing it before installation.

Ask the HVAC contractor for the estimated heating and cooling loads, the equipment they sized to meet them, and the assumptions used to estimate annual electricity. The U.S. Department of Energy’s heat pump training guide explains how design and sizing depend on the home and existing heating equipment. If the proposal includes supplemental heat, ask whether that means retaining a gas furnace or using electric resistance heat, and when it is expected to run.

Compare the winter months separately

Ask the solar installer to show monthly generation beside projected monthly household use. Compare January with January: a system may produce plenty over a full year yet still leave a gap during a cold month. The National Laboratory of the Rockies’ PVWatts calculator can estimate monthly production from the proposed system size and roof orientation. Check that the installer has also accounted for shade at your address. DOE’s homeowner solar guide explains why electricity use and roof conditions both matter.

Ask for a baseline using your current bills and a second estimate with the proposed heat pump. If the HVAC choice is undecided, ask how much the solar recommendation changes between the two cases. Keep estimated electricity use, estimated generation and the resulting bill estimate separate so you can tell which assumption changed.

Give both installers the same electrical plan

Share the proposed heat pump, any supplemental electric heat, and photos of the electrical panel with both contractors. Ask who will evaluate capacity and whether any panel work is included, excluded or still unknown. Agree on who will coordinate the sequence if both projects need work in the same area. The Lee’s Summit solar permit and interconnection guide explains why solar approval and turn-on deserve their own line on the project calendar.

If keeping heat on during a power outage is a goal, make it a separate design question. Ordinary grid-tied panels shut down in an outage. A backup design requires compatible storage, a backup-capable inverter and approved isolation equipment. Ask whether the specific heat pump and any supplemental heat can be supported; see our guide to sizing battery backup for specific circuits for how to frame that conversation. The DOE rooftop resilience guide explains why equipment for backup differs from a standard solar installation.